Home > Knowledge > Content

How to install the conveyor belt

Dec 11, 2020

Put a flexible shaft on the conveyor belt take-up iron core, and set the belt roll up. Before loading the belt, pay attention to the direction of the upper and lower covers not to be reversed.


In the workplace where it is not suitable to be put on the shelf, the conveyor belt roll can be guided away, and the conveyor belt at the fold should have a large curvature radius to prevent damage to the conveyor belt. It is forbidden to place heavy objects on the conveyor belt at the fold. If it is to replace the conveyor belt, the new belt can be connected with the old belt, and the unloading and installation of the new conveyor belt can be carried out simultaneously.


For horizontal conveyors, the old conveyor can be cut off at any point. For conveyors running in an inclined direction, the cut-off point must be selected to prevent slipping out of control due to its own weight.


After correcting the position of the new belt on the conveyor, fix one end of the tape with a clamp, and then connect it with the rope that goes around the rollers and pulleys. The conveyor belt is balanced on the conveyor through the traction device. Prevent the conveyor belt from squeezing with the frame.


Fix one end of the conveyor belt on the conveyor frame with a clamp, and use the pulley to pull the other end tightly until the conveyor belt does not sag significantly on the return roller.


Fix the tensioning device 100-150mm away from the starting point.


Send Inquiry